Fatherford Bridge
Mac Plant were asked to undertake the sub-structure works as part of the new Fatherford Bridge scheme in Okehampton.
Devon County Council
Client
Okehampton, Devon
Location
£200,000
Value
16 weeks
Duration
The purpose of the scheme was to prevent pedestrians having to dismount the existing footpath and walk on a busy main road over the road bridge which didn’t have any footways. The new foot / cycle bridge over the railway line spanned 28m and sat on two reinforced concrete abutments / bank seats.
Works included:
- Excavations and disposal
- Reinforced concrete abutments / bank seats
- ‘Odex’ piling
- Mass embankment make up with structural fill material
- Surfacing
- Fencing
- Landscaping
- Construction of new footways to accommodate pedestrians and cyclists